- Completed
- Athens International Airport, Attica
- 2027
- 2,500 m²
- Airport extension and passenger terminal works
OMEGA GROUP completed a 2,500 m² extension at Athens International Airport Eleftherios Venizelos, delivered within a three-month programme and a construction cost of €360,000. The scope added passenger circulation, retail frontage and a covered arrivals canopy to the existing terminal, executed while airport operations continued uninterrupted. The structure combines a reinforced concrete frame with a long-span steel roof and a fully glazed curtain wall, flooding the interior with natural light and maintaining clear sightlines across the airfield. Finishes are deliberately restrained — polished concrete floors, brushed steel, white acoustic ceilings and integrated LED lighting — so the extension reads as a calm, contemporary addition to one of Greece's busiest gateways.
- STEEL FRAME
- INSULATED PANEL
- HYGIENIC RESIN FLOORS
- INDUSTRIAL MEP
01 / 07
- 2,500 m²
- 42,000 m²
- €360,000
- €144
- 3 months
- Reinforced concrete frame, long-span steel roof, glazed curtain wall
- 2027
ASTOR HOTEL